Receiving doors at a retail pharmacy

Building
Retail pharmacy
Province
Alberta
Work
Hollow metal doors and hardware

The problem

The back receiving doors were damaged, and the existing exit device did not meet code.

What we did

We supplied and installed a new pair of hollow metal doors with new hinges, an exit device, a door viewer, flush bolts and weather-stripping. The existing lockset was reused, and both doors were painted to match the building.

Worn receiving doors before replacementBefore
New hollow metal receiving doors installedInstalled
Finished and painted hollow metal receiving doorsFinished

Emergency exit door and frame

Building
Commercial building
Province
New Brunswick
Work
Hollow metal door, frame and hardware

The problem

An exterior emergency exit needed a new door, frame and hardware.

What we did

We supplied and installed a new hollow metal door and frame with an exit device and trim, a door closer, a threshold and weather-stripping. The existing cylinder was reused, so the keys did not change.

Exterior emergency exit door before replacementBefore
New hollow metal exit door and frameAfter

Dock leveler replacement at a retail store

Building
Retail store
Province
Quebec
Work
Loading dock equipment

The problem

The existing dock leveler had been condemned and could not be used.

What we did

We removed the old leveler, cut and excavated the existing concrete, and formed and poured a new pit. A pit box and a hydraulic dock leveler, 6 ft by 6 ft and rated for 30,000 lb, went in with two laminated bumpers.

Corroded dock leveler before replacementBefore
Dock leveler pit prepared for a new unitDuring
New dock leveler installed at a loading dock doorAfter

Storefront glass at a grocery store

Building
Grocery store
Province
Ontario
Work
Commercial glass

The problem

Two large sealed units in the front windows needed replacing.

What we did

We supplied and installed two clear, tempered, low-E sealed units, each about 87 by 74 inches. Four technicians handled the lift, so the old glass came out and the new glass went in safely.

Replacement sealed glass units delivered to siteDuring
Storefront windows after sealed unit replacementAfter

Exterior door and frame at a grocery store

Building
Grocery store
Province
Ontario
Work
Hollow metal door, frame and hardware

The problem

The frame of an exterior door had rusted out at the base.

What we did

We supplied and installed a new hollow metal door and frame with a door closer, threshold, hinges, weather-stripping, a door sweep, panic hardware and a kick-down door stop. The existing alarm contacts were refitted to the new door.

Rusted base of an exterior hollow metal door frameBefore
New hollow metal door with exit device and closerAfter
New hollow metal door and frame from outsideAfter